경영학과 생산운영관리
상징이미지
로그인  카페찾기 주소 : http://cafe.hanbat.ac.kr/cafe/20091020/
블로그관리자 : 심상오관리자모드 이동
 
프로필이미지
Category
전달 2023.1 다음달
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
 
연구업적

연구 업적

     SCI 학술지 (Refereed journal articles)

  1. Sang-Oh Shim, 2009. Generating subproblems in branch and bound algorithms for parallel machines scheduling problems. Computers and Industrial Engineering. Vol. 57, pp. 1150-1153.

  2. Sang-Oh Shim and Y-D. Kim, 2008. A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property. Computers and Operations Research. Vol. 35, No. 3, pp. 863-875.

  3. Sang-Oh Shim and Y-D. Kim, 2007. Minimizing total tardiness in an unrelated parallel-machine scheduling problem. Journal of the Operational Research Society Vol. 58, No. 3, pp. 346-354.

  4. Sang-Oh Shim and Y-D. Kim, 2007. Scheduling on parallel identical machines to minimize total tardiness. European Journal of Operational Research Vol. 177, No. 1, pp. 135-146.

  5. Y-D. Kim, Sang-Oh Shim, Soo-Bin Kim, Yong-Chan Choi, and Hang-Mook Yoon, 2004. Parallel machine scheduling considering a job splitting property. International Journal of Production Research Vol. 42, No. 21, pp. 4531-4546.

  6. Y-D. Kim, Sang-Oh Shim, Bum Choi, and Hark Hwang, 2003. Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing Vol. 16, No 2, pp. 290-298.

  7. Jung-Ug Kim, Y-D. Kim, and Sang-Oh Shim, 2002. Heuristic Algorithms for a Multi-Period Multi-Stop Transportation Planning Problem. Journal of the Operational Research Society Vol. 53, No. 9, pp. 1027-1037.

 

   일반 학술지

 1. Sang-Oh Shim, 2009. Generating subproblems in branch and bound algorithms for parallel machines scheduling problems. Computers and Industrial Engineering. Vol. 57, pp. 1150-1153.

 

   학회발표 (Conference Papers)

  1. Heuristics for scheduling wafer lots on workstations composed of parallel dedicated machines in a semiconductor wafer fabrication facility, 2009, The 10th Asia Pacific Industrial Enginerring and Management System Conference, Kitakyushu, Japan

  2. Minimizing Total Tardiness in an Unrelated Parallel-Machine Scheduling Problem, 2004, The Tenth Asia Pacific Management Conference, Daejeon, Korea

  3. Tardiness Minimization in Unrelated Parallel Machine Scheduling Problem, 2004, The 33rd International Conference on Computers and Industrial Engineering, Jeju, Korea.

  4. Minimizing Total Tardiness in an Identical-Parallel Machine Scheduling Problem, 2004, The Fifth Asia-Pacific Conference On Industrial Engineering and Management Systems Conference, Gold Coast, Australia.

  5. Scheduling Unrelated Parallel Machines Problem to minimize Total Tardiness, 2003, INFORMS Atlanta Conference, Atlanta, USA.

  6. Simulation-based real-time scheduling in a semiconductor wafer manufacturing facility (II), 2001, INFORMS Hawaii Conference, Hawaii, USA.

  7. Simulation-based real-time scheduling in a semiconductor wafer fabrication facility (I), 2000, The Third Asia-Pacific Conference On Industrial Engineering and Management Systems Conference, Hong Kong, China.

  8. Analysis of Korean and English using Multidimensional Scaling Method, 2000, ESK/JES Joint Symposium, Keongju, Korea.

 

   Project 및 연구 용역

 1. 반도체 및 LCD 제조 공정에서의 생산 통합 일정 계획에 관한 연구 (09.09.01~10.08.31), 연구 책임자, 한밭대학교

 2. 첨단 기술 산업의 생산 라인 수준 일정 계획에 관한 연구 (09.07.01~10.06.30), 연구 책임자, 한국연구재단

 3. SCM하에서의 반도체 생산시스템의 효율적인 생산 일정계획 수립 (07.12.01~08.11.30), 연구 책임자, 학술진흥재단

 4. 삼성전자 System LSI 스케쥴링 디스패칭 시스템 개발 (05.12.16~07.09.30), 책임 연구원, 삼성전자

 5. 생산 제조시스템에서의 시스템 생산 정보 통합, (03.03.01~04.12.31), 참여 연구원, 학술진흥재단

 6. 삼성전자 System LSI 생산라인의 시뮬레이션 모델 스케쥴러 개발 (02.02.01~03.05.31), 참여 연구원, 삼성전자

 7. LG전자 Printed Circuit Board 제조 공정에서의 Advanced Planning and Scheduling 시스템 구축 (00.03.01~01.12.31), 참여 연구원, LG 전자 

 

주소
 
전체댓글전체댓글
내가쓴글내가쓴글
로그인 후 이용가능 합니다.
내가쓴글링크사이트
내리기